General characteristics
-Natural gas system
-Heat-resistant pumice stone is used
-Smart elevator system
-Internal fire detector
-Full generator
-Internal features
-Suspended ceiling
-Kitchen cabinets
-Wardrobe
-Bathroom cabinets
-Kitchen countertops
-Steel entrance door
-Double-glazed windows for PVC windows
-Imported silicone-based paint
-Plumbing of the 1st class
-Tongue-and-groove parquet 10 mm
-Glass balcony railings
Social zone
-Swimming pool
-Outdoor parking
-Outdoor playground
-Gazebos
The project has 5 apartments on each floor. One block consists of 14 floors, built on a plot of 4133 m2. The apartments consist of 3+1 gross 140 m2 and 2+1 gross 100 m2.
START OF CONSTRUCTION: 30.12.2022
DELIVERY OF THE OBJECT: 30.12.2024